Product Design & Development

Long Lead Ball Screws

Friday, February 03, 2006

 Share
[-] Text [+]  
Loading...

Long Lead Ball Screws

A line of long lead ball screws features a ball circulation system designed to promote high linear speeds and low noise levels. These ball screws are suitable for providing precise positioning in a wide range of linear-actuation applications, including packaging and automation systems, laser cutting, woodworking, and production machinery. The ball screws are available with a nut with axial play (Series SL) or with backlash elimination (Series BL) to achieve the desired operation. Smooth performance is enhanced with the optimized end-cap ball recirculation system. The standard product range also includes a rotating nut design (Series SLT and BLT) for applications where critical speed or inertia is an issue. Long lead ball screw diameters range from 25 to 50 mm and leads range from 20 to 50mm. The assemblies can be equipped with the necessary end machining and with the support bearing package pre-assembled and ready to go. They can further be customized with double protection wipers and brush wipers in both cylindrical and flanged nuts configurations. Standardized long lead screws users can be customized to satisfy any particular application specifications.


ADVERTISEMENT

At Issue

Risky Business: Funding Medical Device Innovation
Rahul Sathe, Principal Mechanical Engineer, Surgical and Interventional Products, Cambridge Consultants
Extracting Nuggets from the Invention Mine
Tom Tuytschaevers, a member of our Patent Practice Group

Site Sponsors


Most Viewed

Videos & Webcasts

Rocking Massage Chairs Scan Your Body to Fit Your Profile 2/6/2012
The Inada Yu•Me chair incorporates a scanning technology that takes a profile of the users back, compares the profile to 160 stored body profiles, identifies a match, and customizes the massage for anyone between 5’0” and 6’2”.   Continue
The Development Process of Yamaha Top Cases 2/6/2012
Yamaha's European engineering and design team have created two new premium quality Genuine top cases that have been developed exclusively for Yamaha scooters and motorcycles.     Continue
Miniatur Wunderland 2/6/2012
The largest model railway in the world, Miniatur Wunderland Hamburgand, one of the most successful tourist attractions in Germany.   Continue

Top Stories and Headlines
EVERY DAY!

FREE Email Newsletter